Design-Build Electrical Engineering Services

Our team provides in-house engineering for projects that require designed and sealed plans. We deliver faster schedules, improved communication, and a workflow that stays on track.

A REAL DIFFERENCE

In-House Electrical Engineering Support

At East-West Electric, we offer in-house Professional Engineering services to our clients. This differentiates us from the competition and provides tremendous value to our customers. When a project requires a permit (and most do!), we can create and seal the plans required by the Building Department using our own team of Engineers and Designers. In our experience, the ability to design in house helps with project cost, schedule, and construction flexibility. We have also been able to create very strong relationships with Utility Companies and Building Departments through this design build approach.

Our in-house Electrical Engineering team allows the project process to flow much more efficiently than firms without Engineering services.

Plans Belong to You

Our initial proposals include Engineering Services, which are considered complete once a permit is issued. The electrical plans created during this phase become the owner’s property and provide full documentation of the project. If detailed plans of the existing electrical system exist, we can update those plans to include the project being completed.

Materials Arrive Sooner

After proposal acceptance, we can often order equipment while the plans are in permit review. When we’re the Engineer for the project, we have the confidence to make this order before the permit is fully approved. This early start helps compress the schedule and limits delays tied to material availability, keeping the project moving while permits work through review.

Engineers Are Always On-Hand

If any problems arise that require re-engineering or modifications to the plans, we don’t have to stop progress to get an Engineer’s response. We just walk over to their desks!

SEALED ELECTRICAL DESIGNS

Design-Build Coordination from Day One

Because engineering is included in your initial proposal, you know exactly what’s being designed and what will be submitted. Plans become your documentation.

Receive Signed and Sealed Drawings

Clear, compliant plans you can submit with confidence.

Update 'As-Builts' From Existing Plans

Your drawings stay accurate and reflect the work being done.

Properly Define Your Electrical Scope

You lock in a scope that avoids all surprises.

PROJECT Services

Engineered to Serve Your Team

Our team of electrical engineers focus on these services and provide support for many more:

Electrical Design and Documentation
• Power distribution design and diagrams
• Panel schedules and load calculations
• Lighting layouts and controls
• Feeder, branch circuit, and device layouts

Permit and Code Support
• Signed and sealed electrical plans for permit submission
• Coordination with Building Departments & plan reviewers
• Revisions and responses to comments
• Integration with applicable electrical codes & local requirements

East-West Electric also offers NFPA 70B compliance services for facilities that need electrical equipment maintenance programs aligned with this standard. East West Electric, INC. Engineering and NFPA 70B planning often work together for larger commercial and industrial sites. We’re happy to guide you through the process. Learn More >

PROJECT TYPES

Where Engineering Services Plug In

Commercial Projects
Retail spaces, medical offices, surgery centers, warehouses, generators, automatic transfer systems, EV charging, lighting upgrades, and new construction. Learn more about our commercial work.

Industrial facilities
Manufacturing, clean rooms, refrigerated warehouses, HVAC and chiller replacements, and other process-driven spaces that rely on dependable power and clear documentation. Explore our industrial services.

Marine and Waterfront
Dock and shore power, marinas, and marine electrical systems that require careful permitting, code compliance, and coordination with local authorities. View our marine and waterfront services.

Larger residential projects Whole-home rewires, panel changes, generator installations, and remodels that call for engineered plans during permitting.
Review our residential electrical projects.

"If you're starting a project that needs designed, East-West Electric is a no-brainer. Their plans are perfect and their internal communication is outstanding . In-house engineering is definitely the way to go."

– Mike R., 2025

GET STARTED

Plan Your Next Project With In-House Engineering Built In

Tell us about your project, and we will outline how our engineering team & electricians can support it from design through completion.

Call Our Main Office:

(727) 771-9403

Email Our Head Engineer:
info@east-westelectric.com

FAQ

Frequent Questions

If you don’t see your question here, please reach out.

Yes. The engineering team supports new construction projects and modifications to existing electrical systems, including panel changes, service upgrades, lighting upgrades, and system expansions, in line with the wider services East-West Electric already offers.

When a project needs stamped electrical plans or permit-ready drawings, your proposal includes Engineering Services as part of the scope. Engineering is considered complete when the permit is issued and the plans are accepted.

If you have accurate, detailed drawings of your current system, our team can update those documents to include the new work. This helps maintain a consistent record of your building’s electrical system.

Yes. East-West Electric has built relationships with Utility Companies and Building Departments through its design build approach. The engineering team uses those relationships to support permit review, service changes, and other project needs.

East-West Electric is based in Clearwater, Florida, and provides services across Pinellas, Pasco, and Hillsborough Counties, along with other areas of Florida for certain projects.

Yes, our Florida State Contractor License number is #EC0001444. We also have public liability insurance policies that we show on the job. This will protect both our team and yourself, should an accident occur. So far, our insurance policies have not been required in the 30 plus years we have been in business.

We start every project with a clear proposal that outlines scope, timelines, and expectations. Smaller residential work often moves quickly, but commercial projects will likely require a site review from our engineering team to establish accurate pricing and define the full scope. This process keeps the project aligned from the start and supports our strong record of staying within budget.

Contact East-West Electric through the website or by phone. Share your project type, location, and timeline. The team will review the scope and let you know how Engineering Services fit into your project plan.

Prepare A Clear Electrical Design Brief

Define The Building’s Intended Use

Electrical design begins with understanding what the property needs to do. Describe the existing use, the proposed use, and the changes planned for the space. New construction, a tenant improvement, an equipment upgrade, and a service change may require different information. Identify the project owner and the design or construction contacts already involved. A clear brief helps align the electrical scope with the broader project before detailed decisions are made.

Collect Drawings And Equipment Data

Provide available electrical drawings, architectural plans, equipment schedules, and manufacturer specifications. Label documents that are preliminary or no longer reflect the installation. If equipment is still being selected, identify that uncertainty rather than filling the gap with an assumed load. The quality of the starting information affects how accurately the design team can understand existing conditions and the decisions that still need to be resolved.

Identify Capacity And Coordination Questions

Tell us whether your project introduces equipment, changes the layout, or modifies the electrical service. The design discussion may include capacity, distribution, circuit routing, and coordination with mechanical or other building systems. Some questions cannot be resolved from plans alone and may need field review. Bringing those questions forward early helps distinguish confirmed conditions from items that require investigation.

Connect Design With Construction

East-West Electric’s design-build approach brings engineering and electrical installation into the same project conversation. Share the proposed construction sequence, occupied areas, and any work that depends on another trade. Utility and building-department coordination may also shape the process, depending on the scope. A useful project brief identifies responsibilities and outstanding information so the next step is based on the work proposed for your property.

Start A Local Project Conversation

Our engineering service page describes work for commercial, industrial, marine, and larger residential projects. East-West Electric is based in Clearwater, with services across Pinellas, Pasco, and Hillsborough counties and other Florida areas for certain projects. Include your address, project type, drawings available, and desired schedule. The team can review that starting point and discuss how engineering services fit the proposed scope.

Document The Existing System

For an existing building, organize the information available about its electrical service, distribution equipment, and major loads. Current drawings can provide a useful starting point, but they may not capture every modification made over the life of the property. Identify areas where the records are incomplete and explain which parts of the building will be affected. The design discussion can then distinguish documented information from conditions that need field confirmation.

Plan For Equipment Decisions

Equipment selection can affect an electrical design. Share manufacturer specifications when available and identify equipment that has not been selected. Similar equipment can have different connection or control requirements, so a general product category may not answer every design question. If selection is still underway, explain who is making that decision and when the information is expected. This helps keep preliminary planning aligned with the decisions that will define the installation.

Coordinate An Occupied Property

A project in an operating business, industrial facility, or occupied home needs a discussion about access and continuity. Identify spaces that must remain in use, the people responsible for operations, and any restrictions on work windows. Some tasks may depend on coordination with other trades, utilities, or the authority reviewing the work. Bringing these conditions into the design conversation helps the team understand the practical limits before installation details are finalized.

Clarify What The Project Will Deliver

When you review a proposed design scope, ask which drawings, calculations, or coordination activities belong to the project. Identify who will receive the information and how it will be used by the construction team. The services required depend on the work and existing conditions. A small modification may need a different review from a new facility or major service upgrade. Discussing the deliverables helps property owners and project contacts understand the next step.

Carry Changes Through The Team

Project changes should reach the people responsible for the electrical design and installation. If a room changes use, equipment is substituted, or another trade revises its work, explain the change before assuming the previous electrical plan still applies. Keep the relevant project contacts involved and identify the current drawings. A consistent record of decisions supports coordination from the initial brief through construction and later property maintenance.

Manufacturing electrical work   |   Start an engineering inquiry